Home > Product > constructional profiles

aluminum scaffold, aluminum beam

aluminum scaffold, aluminum beam
Click to see the original picture
Product Name:aluminum scaffold, aluminum beam
Place of Origin:Peoples Republic of China
Post Date:December 23, 2016
Edit Date:December 23, 2016
Company Name :
Shandong Mactolli Aluminum Formwork Engineering&Technology Co.,Ltd
Tel:18766552339
Add:conglin industrial,longkou,shandong province
E-mail:209876124@qq.com
Detailed Product Description:

Looking For A Better Solution In Construction,Mactolli Aluminum Formwork Is The Answer.

Introduction of Mactolli

Depending on the national technical center, national laboratory and perfect Aluminum production line and advanced welding processing of Conglin Group Co., Ltd, Mactolli Aluminum Formwork Engineering and Technology Co., Ltd, applies for domestic advanced Aluminum Formwork design and installation technology with a business pattern of combining sales, leasing and construction, supplied a new generation of Aluminum Formwork System.

In 2014, Mactolli Aluminum Formwork Engineering and Technology Co., Ltd invested 1 billion to build 200 acres new plant, and the annual production of the aluminum template is up to 500 thousand square meters.

Our company owns a team of over 50 experienced professionals, including designers, industry consultants and more than 500 manufacturing workers and construction experts, which can supply engineering design, manufacturing process, hosting, refurbishment, recycling, training, construction and other relevant supporting services for major real estate development companies, construction companies and leasing companies.

Ten Advantages of Mactolli Aluminum Formwork System  

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel. With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction, which makes for easy handling.

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy, which is very suitable for high rise buildings.

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

8. Recyclable value

The used aluminum material is of greater recyclable value, several times higher than steel.

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

Send a Message

Title:
Name:
Company Name:
Address:
E-Mail:
Confirm Text: Load new image
Message:
 

Related Products