Automatic spraying line
	Semi-automatic spraying line
	Manual spraying line
	Application: workpieces of Al doors and windows , profiles 
	Equipment setting:
	1. Manual spraying line:
	Powder spraying room (double-sides working): 1 set 
	Pulse filter recycling system: 2 sets
	Powder spraying gun: 2 sets
	Powder coating oven: 1set (Fuel--- oil, gas, coal, electricity)
	Feeding carriage: 2sets
	Cyclotron track chain 
	Notes: 
	During powder spraying: electric pattern, variable frequency speed control and cycle circle track are adopted; 
	Spraying the profile by gun and hang profile on the car manually, and push it into the oven for high temperature curing.
	About 4-6 labors are needed; 
	space occupied: over 150 m2 (L>20m).
	2. Semi-automatic spraying line:
	Powder spraying room (double-sides working): 1set 
	Pulse filter recycling system: 2sets
	Automatic gun system with auto lifts: 2sets
	Powder coating oven: 1set (fuel oil, gas, coal, electricity)
	Powder coating gun: 2 sets
	Feeding carriage: 2sets
	Cyclotron track chain: about 40-60 meters
	Variable frequency drive: 1set 
	Notes: 
	During powder spraying: electric pattern, variable frequency speed control and cycle circle track are adopted; 
	Spraying the profile by gun and hang profile on the car manually, and push it into the oven for high temperature curing.
	About 6-10 labors are needed;
	Space occupied: over 300 m2 (L>30m).
	3. Automatic powder coating line: 
	Configuration:
	Powder spraying room (double-sides working): 1set 
	Pulse filter recycling system: 2sets
	Automatic gun system with auto lifts: 2sets
	Powder coating oven: 1set (fuel oil, gas, coal, electricity)
	Powder coating gun: 2 sets
	Feeding carriage: 2sets
	Cyclotron track chain: about 40-60 meters
	Variable frequency drive: 1set
	Note: 
	after putting on the profiles, all the steps are finished automatically.
	The whole process is automatic so it is suitable for large-scale manufacturers.
	Processing method: putting on profile - spraying - powder curing - natural cooling - taking down the profile. 
	About 6-10 labors are needed;
	Space occupied: over 500 m2 (L>60m)







