aluminum curtain wall
1.Assembing units in workshop with high precision.
2.Short erection duration and convenient protection of products.
3.Installation of units can be carried out in parallel with building work to shorten construction period.
4.Pressure-equaliztion and proper drainage to achieve air and water tightness requirements.
5.Use gasket at joints between units to reduce surface contamination.
6.Interlocking male and female profiles provide good resistance to seismic movements.