product name: |
powder coating oven |
Place of Origin: |
Peoples Republic of China |
Post Date: |
April 29, 2015 |
Edit Date: |
March 30, 2020 |
|
|
Detailed Product Description:
Automatic spraying line
Semi-automatic spraying line
Manual spraying line
Application: workpieces of Al doors and windows , profiles
Equipment setting:
1. Manual spraying line:
Powder spraying room (double-sides working): 1 set
Pulse filter recycling system: 2 sets
Powder spraying gun: 2 sets
Powder coating oven: 1set (Fuel--- oil, gas, coal, electricity)
Feeding carriage: 2sets
Cyclotron track chain
Notes:
During powder spraying: electric pattern, variable frequency speed control and cycle circle track are adopted;
Spraying the profile by gun and hang profile on the car manually, and push it into the oven for high temperature curing.
About 4-6 labors are needed;
space occupied: over 150 m2 (L>20m).
2. Semi-automatic spraying line:
Powder spraying room (double-sides working): 1set
Pulse filter recycling system: 2sets
Automatic gun system with auto lifts: 2sets
Powder coating oven: 1set (fuel oil, gas, coal, electricity)
Powder coating gun: 2 sets
Feeding carriage: 2sets
Cyclotron track chain: about 40-60 meters
Variable frequency drive: 1set
Notes:
During powder spraying: electric pattern, variable frequency speed control and cycle circle track are adopted;
Spraying the profile by gun and hang profile on the car manually, and push it into the oven for high temperature curing.
About 6-10 labors are needed;
Space occupied: over 300 m2 (L>30m).
3. Automatic powder coating line:
Configuration:
Powder spraying room (double-sides working): 1set
Pulse filter recycling system: 2sets
Automatic gun system with auto lifts: 2sets
Powder coating oven: 1set (fuel oil, gas, coal, electricity)
Powder coating gun: 2 sets
Feeding carriage: 2sets
Cyclotron track chain: about 40-60 meters
Variable frequency drive: 1set
Note:
after putting on the profiles, all the steps are finished automatically.
The whole process is automatic so it is suitable for large-scale manufacturers.
Processing method: putting on profile - spraying - powder curing - natural cooling - taking down the profile.
About 6-10 labors are needed;
Space occupied: over 500 m2 (L>60m)